AUCC Libya cement 2



Main Conveyor Bridge which transferes limestone and clay from the storage department to Raw mill feed building is presented in this section. Total horizontal length of the conveyor is around 133 meter with a height of 38.2 meter. Special design requirements for explosion protection were requested by the client [explosion cages and the design of certain structural elements to sustain stresses and forces in case of explosion]. the Conveyor design was according to british standards. The structure design-drawings package composed of 10 drawings. The design of the Raw Mill building and the entire department was included in this task. The founder and one of the senior staff designed this department while they worked as a full time engineeres at TCB.